Property division approval

Please note in particular our information under:
  • Short text

    • Permission that entitles you to divide a developed property into several plots and
    • Have the division of the property entered in the land register (e.g. to sell it individually or to transfer assets),
    • Lower building supervisory authority is responsible
  • Service description

    In order to divide a developed property or a property whose development has been approved or which may be developed on the basis of an exemption from approval, and to be able to enter the resulting new properties in the land register, you require a division permit. The building supervisory authority in whose jurisdiction the property to be divided is located will decide on your division application. Please note that any conditions contrary to building law that arise as a result of the division must be eliminated during the application process. This can be done, for example, by declaring and registering building encumbrances.

    Approval is not required if

    • the division is carried out in administrative proceedings under public law or the federal government, the federal state or a regional authority is involved in the division, or
    • a person authorized to perform the tasks has certified that the division is unobjectionable under building regulations.

    If the division does not require approval, the building supervisory authority must issue a certificate upon application by the parties involved. The certificate is equivalent to a permit.

  • Legal basis

  • Required documents

    • Official site plan at a scale of 1:500 showing, among other things, the legal boundaries and the existing structures on the property to be divided as well as the boundary distances, spacing areas and distances between the structures on the property to be divided and the new boundaries (division line) highlighted in color.
    • Construction drawings of the existing structures, insofar as they are required to assess the application (scale 1:100).

    The documents must be submitted in duplicate.

    Special information for - City of Kevelaer

    The official site plan is drawn up by a publicly appointed surveyor.

  • Prerequisite

    Approval of the division is only required for developed properties or properties whose development has been approved or which may be developed on the basis of an exemption from approval.

    Approval may only be refused if the division creates conditions that contravene the provisions of BauO NRW 2018, the regulations issued on the basis of this Act or the provisions of the development plan.

  • Procedure

    Send your application to the lower building supervisory authority. If a division permit is granted or a negative certificate is issued, you will receive this and the notification of fees in writing.

  • What else should I know?

    If no subdivision permit is required, you can apply to the building supervisory authority for a so-called negative certificate to be issued. This confirms to you that your planned division does not require approval or is deemed to be approved. A fee of EUR 50 is charged for issuing the negative certificate.

  • Applications / Forms


Responsible organizational units

Responsible employees

Help with accessibility

  • General

    We endeavor to make our websites accessible. You can find details on this in our accessibility statement. You can send us suggestions for improvement via our feedback form Report accessibility.

  • Font size

    To adjust the font size, please use the following key combinations:

    Larger

    ⌘command
    +

    Smaller

    ⌘command

    Larger

    Ctrl
    +

    Smaller

    Ctrl
  • Keyboard navigation

    Use TAB and SHIFT + TAB to navigate through next/previous links, form elements and buttons.

    Use ENTER to open links and interact with elements.

  • Contrast mode

    Press the following key combination to reduce or increase the contrast:

    Enlarge

    ⌃control
    ⌥option
    ⌘command
    .

    Decrease

    ⌃control
    ⌥option
    ⌘command
    ,
    Note: The shortcuts must be activated in the system settings of the operating system.

    Press the left ALT key + left SHIFT key + PRINT to quickly switch the high contrast mode on or off.

  • Invert colors

    Press the following key combination to switch the color inversion on and off:

    ⌃control
    ⌥option
    ⌘command
    8
    Note: The shortcuts must be activated in the system settings of the operating system.

    First activate the screen magnifier and then switch the color inversion on and off with the following key combinations:

    1. screen magnifier

    +

    2. invert colors

    Ctrl
    Old
    I
  • Screen magnifier

    Press the following key combinations to use the screen magnifier:

    Switch on/off

    ⌥option
    ⌘command
    8

    Enlarge view

    ⌥option
    ⌘command
    =

    Reduce view

    ⌥option
    ⌘command
    Note: The shortcuts must be activated in the system settings of the operating system.

    Switch on / Enlarge view

    +

    Reduce view